TENSERA
Service Detail

Grouting for Bonded Systems.

Duct grouting workflows for confirmed bonded-system applications.

03.1
Service Overview

Buildable layouts, installed with control.

Installation translates approved technical information into an accurately positioned tendon system.

The project-specific scope is established before mobilization. Installation proceeds against approved drawings, agreed access, system requirements and defined inspection stages.

Scope & Deliverables

A clearly defined installation package.

Pre-installation drawing and site readiness review
Tendon placement to approved coordinated layouts
Anchorage and profile positioning
Coordination with reinforcement, MEP and embeds
Pre-pour inspection support and close-out
Installation records aligned with agreed ITP
Execution Stages

A controlled sequence.

01

Review & mobilization

[Project-specific procedure and acceptance requirements]

02

Material receipt & traceability

[Project-specific procedure and acceptance requirements]

03

Setting-out & installation

[Project-specific procedure and acceptance requirements]

04

Interface coordination

[Project-specific procedure and acceptance requirements]

05

Pre-pour inspection

[Project-specific procedure and acceptance requirements]

06

Installation close-out

[Project-specific procedure and acceptance requirements]

Technical Coordination

Approved information at every interface.

SCHEMATIC PLACEHOLDER / NOT FOR CONSTRUCTION

Typical tendon profile & anchorage interface

Approved tendon layouts, slab plans and details to be inserted here following project authorization.

Start a technical conversation

Build the right scope from the start.

Discuss Your Project